Ash Bagging Plant
Contact Us
About The Project
- Complete process & detailed design of ash bagging / block making system including input into the control system.
- Fabricate & install ash screw augers and bag / block carousel system on 3 floors.
- Fabricate & install all associated secondary steelwork, access & platforms.
- Installation of ash batch mixer and associated scrubber unit.
- Integration of new ash bagging / block making system into existing ash outloading system.
- Installation of carrier screens, vibration tables, lump breaking system, rotary valves (to seal the boilers), cooling conveyors to cool down the hot ash from 600°c.
- Associated site works (Mechanical & Electrical) including air lines and heat tracing.
Client Name: Indaver Ireland, 2028 - 2019
Location: Duleek, Co. Meath