Ash Bagging Plant

Contact Us


Home / Case Studies / Ash Bagging Plant

About The Project

  • Complete process & detailed design of ash bagging / block making system including input into the control system.
  • Fabricate & install ash screw augers and bag / block carousel system on 3 floors.
  • Fabricate & install all associated secondary steelwork, access & platforms.
  • Installation of ash batch mixer and associated scrubber unit.
  • Integration of new ash bagging / block making system into existing ash outloading system.
  • Installation of carrier screens, vibration tables, lump breaking system, rotary valves (to seal the boilers), cooling conveyors to cool down the hot ash from 600°c.
  • Associated site works (Mechanical & Electrical) including air lines and heat tracing.

Client Name: Indaver Ireland, 2028 - 2019

Location: Duleek, Co. Meath