About The Project

Timeline: 2019 – 2024

Keg Plant Utilities – Internal & External Piperacks

Design of bespoke carbon steel and stainless pipe racks including supporting load calculations.

Fabrication (including painting of all components) and pre-population of pipe racks in Buttimer Engineering Pre-assembly facility.

Installation of Carbon Steel & Stainless Steel pipework.
Design, fabrication and installation of stainless-steel platforms / access internally for the new kegging equipment.
We have been awarded safety contractor of the month on two occasions
Overall Project Management of installation process.

Client Name: Diageo

Location: St James Gate Dublin, Ireland