Lynskey Engineering

Sectors: Power Generation
Contact Us


Home / Case Studies / Lynskey Engineering

About The Project

Design Manufacture of Auxiliary Power fuel storage tanks & access

Timeline

2023 to 2024

Services Provided

  • Design, fabrication and delivery of 15 x Fuel storage tanks with a combined storage capacity of 2.3m Litres.
  • Design, fabrication & installation of access walkways, supporting towers for fuel storage tank farm.
  • This project has a mixture of painted carbon steel, stainless steel and galvanised steel.

Client Name: Lynskey Engineering Ltd.

Location: Grange Power, Clondalkin, Co. Dublin

Gallery

Testimonials

Related Case Studies