MGT Renewable Energy Plant

Sectors: Power Generation
Contact Us


Home / Case Studies / MGT Renewable Energy Plant

About The Project

Timeline

2017 – 2019

Description of Services provided:

BUILD PHASE NO 1

Teeside Biomass Power Station in Teeside Port, UK (299 MW)

The largest wood pellet powered plant in the UK and one of the largest in the world.

  • Installation of 1,600 vibrating motorised panel in the floor systems of 16 Bulk Storage Silos.
  • Installation of 20 belt conveyors with total length of over 2km for loading and unloading 16 bulk handling silos.
  • Installation of approx. 5,000 tons of steel work to support bulk handling system.
  • Installation of 4 x bulk storage silos.
  • Preassembly off-site of silo gallery sections and installation of same at height of 40m via tandem lifts.
  • Installation of secondary steelwork including platforms & access steel.
  • Currently on site carrying out ongoing systems completion, facility upgrades and maintenance works.

Client Name: Técnicas Reunidas

Location: Teeside, Middlesbrough, UK