Buttimer Engineering has successfully completed the design and build of several large-scale grain transfer and storage facilities for us across Poland. We were impressed by their professional approach to the job and high-quality solution provided, and would have no hesitation recommending them.
West Twin Silo Upgrade Project
Sectors: Ports & Bulk Cargo Hubs
Contact Us
About The Project
Intake Upgrade Project and Rail Mounted Hopper. In house process design of material flow including integration to existing material handling system and storage.
The Docksolid® system provides fully automated crane and hopper operation, with real-time integrated control, reducing cycle time, eliminating cargo spillages, and increasing overall efficiency. The system provides 1,000 tonne per hour capacity and facilitates offloading via 4 different routes and capacity modes.
Associated civil and structural, electrical and instrumentation elements including weighers, gantries, motors, drivers, access and escape stairs and all necessary electrical, dust filtration and instrument installations.
Client Name: West Twin Silo
Location: Belfast, Northern Ireland
Project Budget: 1.2 Million